A production reduction at the Buffalo Pound Water Treatment Plant is tentatively scheduled for Tuesday, Nov. 7 from 7 a.m. to 3 p.m.
The scheduled shutdown is required to accommodate construction projects at the Plant.
Plant production will be reduced to 60 ML/D.
A Review of reservoir capacities will be conducted prior to the outage to determine if the outage will proceed.
Moose Jaw will be capable of receiving a maximum of 20 ML/d depending on Plant volumes.
Regina will receive a maximum of 54 ML/d.
SaskWater/Buffalo Pound Provincial Park will remain at current production unless there is a shortage of water at the Plant.
Anyone with concerns about the outage is asked to call 306-631-1750.
In response to Canada's Online News Act and Meta (Facebook and Instagram) removing access to local news from their platforms, Discover Moose Jaw encourages you to get your news directly from your trusted source by bookmarking this page and downloading the Discover Moose Jaw app HERE.